Data Center Risk Analyzer

Level 1 · Pre-visit document review

Fictional facility for training.

Review DC-1's pre-visit document pack.

Flag what you'd raise before the site visit.

DC-1 is one building with two data halls, a utility substation with two transformers, diesel generators in a yard enclosure, a chilled-water plant with a rooftop air-cooled condenser, a Li-ion UPS room, and one hall with rack Li-ion battery backup units.

How this level works

  1. Open each of the 11 documents and read the excerpt.
  2. Mark it Acceptable, Recommendation, or Critical.
  3. If you do not mark it Acceptable, choose the governing source.
  4. Submit. The score is out of 200.

Scoring

  • 10 points for flagging an item the expert flags.
  • 5 more if your severity matches.
  • 5 more if your source matches.
  • 10 points for marking an acceptable item Acceptable.
  • A false flag costs 5 points.

85% and above is Ready for the site walk. 60% to 84% is a Solid start. Under 60% means Review the misses.

Your calls stay in this browser until you choose Try again. There is no login.